Wikipedia / 1985 in spaceflight
Wikipedia / 1985 in spaceflight
The following is an outline of 1985 in spaceflight.
Overview
First Atlantis flight
Orbital launches
|colspan=8 style="background:white;"|
January
|-
|colspan=8 style="background:white;"|
February
|-
|colspan=8 style="background:white;"|
March
|-
|colspan=8 style="background:white;"|
April
|-
|colspan=8 style="background:white;"|
May
|-
|colspan=8 style="background:white;"|
June
|-
|colspan=8 style="background:white;"|
July
|-
|colspan=8 style="background:white;"|
August
|-
|colspan=8 style="background:white;"|
September
|-
|colspan=8 style="background:white;"|
October
|-
|colspan=8 style="background:white;"|
November
|-
|colspan=8 style="background:white;"|
December
|-
|colspan=8 style="background:white;"|
|}
Suborbital flights
|}
Deep Space Rendezvous
Date (GMT) | Spacecraft | Event | Remarks |
11 June | delivered lander and balloon on Venus | ||
15 June | delivered lander and balloon on Venus | ||
11 September | ISEE-3/ICE | Flyby of 21P/Giacobini-Zinner |
EVAs
Start date/time | Duration | End time | Spacecraft | Crew | Remarks |
16 April | 3 hours6 minutes | Installed an improvised switch-pulling tool, called the Flyswatter, on the RMS robotic arm. The Flyswatter was used in an effort to push the sequencer start lever on the Leasat-3 in the proper position for deployment. This attempted repair was the first unplanned spacewalk in NASA history. | |||
2 August07:15 | 5 hours | 12:15 | Installed a third pair of solar arrays on exterior of Salyut 7. | ||
31 August | 7 hours | STS-51-IDiscovery | Van Hoften rode the RMS to capture the Leasat 3 satellite and pulled it into payload bay. Fisher and Van Hoften secured and started repairs on the satellite in the payload bay. The retrieval was complicated by a malfunction of the RMS that made operation of the arm more complicated. | ||
1 September | 4 hours26 minutes | STS-51-IDiscovery | William FisherJames van Hoften | Completed repairs on the Leasat 3 satellite. Then Van Hoften, riding the RMS, heaved the satellite out of the payload bay, imparting the required spin needed to fire the perigee motor. | |
29 November | 5 hours32 minutes | Practiced construction techniques in the payload bay and assembled and disassembled the two experimental EASE/ACCESS structures. | |||
1 December | 6 hours41 minutes | STS-61-BAtlantis | Jerry L. RossSherwood C. Spring | Conducted supplementary experiments on the EASE and ACCESS structures, including a test of the RMS to aid in the construction experiments. |
References
Footnotes