Wikipedia / Georgia State Route 61
Wikipedia / Georgia State Route 61
State Route61 (SR61) is a state highway that travels south-to-north through portions of Carroll, Douglas, Paulding, Bartow, Gordon, and Murray counties in the western and northwestern parts of the U.S. state of Georgia. The highway connects the Carrollton area with the Tennessee state line, via Villa Rica, Dallas, Cartersville, and Chatsworth. The portion of the highway from just northeast of Carrollton to Villa Rica was formerly the path of US 78S. When that highway was decommissioned, it was redesignated as US 78 Alternate.
Route description
SR61 begins at an intersection with SR 166, northeast of Carrollton in Carroll County. It heads north-northeast to the town of Villa Rica. There, it has an interchange with Interstate 20 (Tom Murphy Freeway). This interchange also marks the southern terminus of SR 101. SR61/SR101 head north concurrent, to an intersection with US 78/SR 8. At this intersection, SR101 SR 61 departs while US78/SR8 head concurrent to the east. Then SR 61 departs the concurrence with SR 120 on the villa rica bypass then it meets with Dallas hwy and goes north. The highway passes the Mirror Lake Golf Club, cuts across the northwestern corner of Douglas County, and enters Paulding County. In the town of Dallas, it intersects US 278/SR 6/SR 120 (Jimmy Campbell Parkway). The highway heads north on Nathan Dean Boulevard and meets SR 6 Business. SR6 Business/SR61 head concurrent to the northwest. Just under later, they meet the southern terminus of SR 381 (East Memorial Drive). Almost immediately, SR61 departs to the north-northwest, on North Confederate Avenue. It travels through rural areas and crosses into Bartow County. It passes the Cartersville Airport and enters Cartersville. There, it intersects SR 113, which runs concurrent with it into the main part of town. Along the way, they cross over the Etowah River. Also, SR 293 joins the concurrency for a short while. At the end of the concurrency, SR61 departs to the north, while SR113 (East Main Street) continues to the east-northeast and SR293 (South Tennessee Street) heads south. Then, SR61 has an interchange with US 41/US 411/SR 3/SR 20 (Joe Frank Harris Parkway SE). At this interchange, US411/SR20 head concurrent with SR61 for just over , where SR20 splits off to the east. US411/SR61 head northeast to an interchange with I-75, before leaving Cartersville. They pass through the towns of White and Rydal before intersecting SR 140, just north-northwest of Rydal. Farther to the north-northeast, the concurrency crosses into Gordon County. In the town of Fairmount is a brief concurrency with SR 53. US411/SR61 pass through the town of Ranger before meeting the eastern terminus of SR 156. Just before entering Murray County, the concurrency meets an old segment of US411/SR61 and intersect SR 136 (Nicklesville Road). Shortly after entering the county, they cross over the Coosawattee River. In the unincorporated community of Ramhurst, they intersect US 76/SR 282. At this intersection, US76 joins the concurrency, and SR282 meets its western terminus. US76/US411/SR61 continue to the north-northwest and meet the northern part of the aforementioned stretch of old US411/SR61. In Chatsworth, SR 2/SR 52 (East Fort Street) join the concurrency. This intersection also marks the eastern terminus of SR 52 Alternate (West Fort Street). A few miles farther to the north, US76/SR52 split off to the west on G.I. Maddox Parkway, while the other three routes continue to the north-northeast. In the town of Eton is the eastern terminus of SR 286. On the way to Cisco, US411/SR2/SR61 pass through Crandall. In Cisco, SR2 departs to the west. A little ways farther to the north-northeast, they curve to the northwest, pass through the town of Tennga, and curve to the north. On the northern edge of town, they reach the Tennessee state line. Here, SR61 ends, and US411 crosses into Tennessee, where Tennessee State Route 33 begins.
The following portions of SR61 are part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense:
A brief portion northeast of Carrollton
From the interchange with US41/US411/SR3/SR20, in Cartersville, to an indeterminate point in McCallie, just north of I-75
The entire length of the US76 concurrency, from a point south-southeast of Chatsworth, to the northeastern part of the city.
History
1920s
The roadway that would eventually become SR61 was designated at least as early as 1919 as SR 36 from northeast of Carrollton to Villa Rica. Also, an unnumbered road was established from Chatsworth to the Tennessee state line in Tennga. By the end of 1921, SR 4's eastern extension was built from Cartersville to Fairmount. Also, the segment of SR2 between Calhoun and Ellijay was shifted southward, with it designated on the Fairmount–Chatsworth segment. By the end of 1926, SR34 had been redesignated as a southern branch of SR8. All of its length had a "sand clay or top soil" surface. SR61 was designated on the previously unnumbered road north-northeast of Chatsworth. The southern half of the segment of SR4 from Cartersville to Fairmount had a sand clay or top soil surface. The northern half of the segment of SR2 from Fairmount to Chatsworth had a completed semi hard surface. Before the decade ended, US 78S was designated on the segment of SR8 from northeast of Carrollton to Villa Rica. The segments of SR4 from Cartersville to Fairmount, and SR2 from Fairmount to Chatsworth, were redesignated as a southern extension of SR61. At this time, the Chatsworth–Tennga segment was under construction.
1930s
In 1930, the Cartersville–Rydal segment, as well as a small portion north of the Gordon–Murray county line, was under construction. The Rydal–Fairmount segment, as well as a small portion south-southeast of Chatsworth, had a completed semi hard surface. Later that year, a small portion of SR8 southwest of Villa Rica, as well as a portion north of the Gordon–Murray county line, was under construction. The Cartersville–Rydal segment had a sand clay or top soil surface. Also, the Gordon County portion of the Fairmount–Chatsworth segment had completed grading, but no surface course. The next year, the segment of SR8, from northeast of Carrollton to just southwest of Villa Rica, had a completed hard surface. The Cartersville–Rydal segment was under construction. A portion north of the Gordon–Murray county line had completed grading, but no surface course. The Chatsworth–Tennga segment had a sand clay or top soil surface. In January 1932, an unnumbered road was built between Villa Rica and Cartersville. In March of that year, SR61 was designated on the previously unnumbered road from Dallas to Cartersville; however, there was no indication as to whether it was designated on the Villa Rica–Dallas segment. By the end of the year, the Cartersville–Rydal segment had completed grading, but no surface course. Near the end of 1933, this segment had a sand clay or top soil surface. The next year, SR61 was designated on the Villa Rica–Dallas segment. SR20 was designated on the Cartersville–Rydal segment. Also, a small portion north-northeast of Rydal had a completed semi hard surface. Before the year ended, US411 was designated on the Cartersville–Tennga segment. The Rydal–Fairmount segment had a completed semi hard surface. A few months later, a portion south-southwest of Dallas was under construction. At the end of the year, a small portion north-northeast of Cartersville, and a portion north of Chatsworth, had a completed hard surface. Late in 1936, the central portion of the segment from Cartersville to Rydal had completed grading, but was not surfaced. Also, the Fairmount–Crandall segment had a completed hard surface. At the end of the year, a portion south-southwest of Rydal had a completed hard surface. A few months later, the Crandall to Tennga segment also had a completed hard surface. By the middle of 1937, about half of the segment from Villa Rica to Dallas, as well as a portion north of Dallas, was under construction. At this time, the segment from Cartersville to Rydal had a completed hard surface. Later that year, the highway was under construction from Villa Rica to the Paulding–Bartow county line. At the end of the year, a portion south-southwest of Dallas and a portion south of Fairmount had a completed hard surface. The next year, US78S was redesignated as US 78 Alternate. The Rydal–Fairmount segment, as well as the Paulding County portion of the Villa Rica–Dallas segment, had a completed hard surface. By the middle of 1939, the portion of the Villa Rica–Dallas segment that was in Carroll and Douglas counties, as well as the Paulding County portion of the Dallas–Cartersville segment, had completed grading, but was not surfaced. The decade ended with SR 20 Spur being built in the northern part of Cartersville, to function like a northern bypass of the main part of the city. Also, the Bartow County portion of the segment from Dallas to Cartersville was under construction.
1940s
At the beginning of 1940, the central portion of the Dallas–Cartersville segment had a completed hard surface. Near the end of the year, the entire Villa Rica–Dallas segment, as well as the Paulding County portion of the Dallas–Cartersville segment, had a completed hard surface. In 1943, SR20 was shifted off of US411/SR61 to replace the old SR20 Spur and SR 113's routing east of Cartersville. By the end of 1946, the Bartow County portion of the segment from Dallas to Cartersville had a completed hard surface. A year or two later, the southern branch of SR8 was redesignated as SR 8 Alternate (SR8 Alt.).
1950s to 1980s
In 1952, US78 Alt. was decommissioned. By the middle of 1954, SR8 Alt. was redesignated as a southern extension of SR61. Two decades later, SR2 east of Cisco was impassable due to rock slides. It wasn't until near the end of the 1980s that SR2 was re-routed south-southwest along US411/SR61 from Cisco to Chatsworth, where it began a concurrency with US76/SR52. US76/SR2/SR52 traveled to the east and southeast into Ellijay, where SR52 departed the concurrency. US76/SR2 turned left onto SR5. They traveled northeast into Blue Ridge. Here, SR5 departed the concurrency, and US76/SR2 headed east as previously.
Major intersections
Cartersville connector route
See also
References
External links