Interstate11 (I-11), officially known as the Purple Heart Highway, is an Interstate Highway that runs for on a predominantly northwest–southeast alignment in the U.S. state of Nevada. It runs concurrently with either or both US 93 and US 95 from the Arizona state line (at the Mike O'Callaghan–Pat Tillman Memorial Bridge over the Colorado River within the Lake Mead National Recreation Area outside of the city limits of Boulder City) to Kyle Canyon Road (SR 157) and Sunstone Parkway in Las Vegas.
The freeway is tentatively planned to run from Nogales, Arizona, to Fernley, Nevada, generally following the current routes of I-19, I-10, US93, and US95. Planners anticipate upgrading four existing highway segments to carry future I-11: US93 in Arizona (from Kingman to the Nevada state line and from Kingman to Wickenburg), US95 in Nevada (from the Las Vegas Valley to Schurz), and either US95 (via Fallon) or US 95 Alt (via Yerington) to Fernley. The most recent extension came in 2024, when officials replaced I-515 signs in Las Vegas with I-11 signs and added I-11 signs on US95 north of Downtown Las Vegas, which extended I-11 northward about . An extension of the Interstate northward along US95 to Mercury, Nevada, is planned after that. An exact alignment for I-11 south of Wickenburg has yet to be determined; a number of corridor alternatives, however, have been identified for further study and refinement.
The building of I-11 in Arizona as a freeway bypass from I-19 in Sahuarita to US93 in Wickenburg is controversial. It is currently facing fierce local opposition and backlash from conservation groups and others, citing costs and environmental, traffic, economic, and safety concerns. The project is on hold pending litigation .
The numbering of this highway did not initially fit within the usual conventions of the existing Interstate Highway grid, as the whole route was east of I-15. I-17 was already built to the east of the I-11 alignment in Arizona, making it impossible to fit this freeway's Interstate number into the national grid and remain within the traditional numbering convention. I-11 being extended along US95 through Las Vegas and crossing over I-15 remedied this situation since it put a portion of I-11 west of I-15 and, thus, in line with the national grid numbering conventions.
Route description
The highway currently begins at the Arizona state line at the Mike O'Callaghan–Pat Tillman Memorial Bridge, then runs along the Boulder City Bypass around Boulder City, which opened on August 9, 2018. It is signed concurrently with US 93 throughout. An at-grade intersection just north of the Buchanan Boulevard overpass is for emergency vehicles only. At mile14, I-11 intersects and joins with US 95 heading north. Continuing northwest, the highway runs along the former I-515 around Henderson to the Henderson Spaghetti Bowl interchange with I-215 and Lake Mead Parkway (SR 564).
On May 21, 2024, I-11 was extended through the Las Vegas Valley along US93/US95 (the rest of the alignment of former I-515) to Downtown Las Vegas and I-15, then running concurrently with US95 northwest to SR 157. When this segment was designated, I-515 was decommissioned. Studies to extend I-11 from SR157 northward to Mercury were started in late 2023.
From I-15 to Elkhorn Road, I-11 and US95 have HOV lanes that are currently enforced by both LVMPD (aka Metro) and NSP (formerly NHP).
History
As recently as 1997, US93 was mostly a two-lane road between Wickenburg and Hoover Dam and was known for its dangerous curves and hills in the stretch between Wickenburg and I-40. In the late 1990s, the Arizona Department of Transportation (ADOT) began widening US93 to four lanes and, in some areas, building a completely new roadway. In other places along the route, ADOT simply repaved the old highway and built two new lanes parallel to it. ADOT also began studying the possibility of adding grade separations to US93 near the Santa Maria River to make the road a full freeway.
At the same time, Nevada and Arizona began looking at US93's crossing of Hoover Dam, a major bottleneck for regional commerce, with hairpin turns, multiple crosswalks for pedestrians, and steep grades. Plans for a bridge to bypass the dam became even more urgent when the road was closed to trucks after the September 11 attacks in 2001, forcing commercial traffic to detour through Bullhead City, Arizona, and Laughlin, Nevada, causing major transport delays as a result.
With the completion of the Mike O'Callaghan–Pat Tillman Memorial Bridge on October 14, 2010, the vast majority of the roadway was now a four-lane divided highway. Still, with Phoenix and Las Vegas as the two largest neighboring cities in the U.S. not connected by an Interstate, leaders in both cities lobbied to include I-11 in the next Transportation Equity Act for the 21st Century re-authorization. With the rise of the concept of "megapolitan" urban regions, I-11 is considered a key connector to unify the triangle formed by Las Vegas, Phoenix, and the Los Angeles area (the triangle consisting of I-15 to the north/west, I-10 to the south, and I-11 on the east). The Federal Highway Administration (FHWA) approved the Nevada Department of Transportation (NDOT)'s environmental review of a bypass around Boulder City, which would connect the end of the recently-constructed Hoover Dam Bypass bridge east of Boulder City to I-515 west of the town.
In December 2013, University of Nevada, Las Vegas, researchers discovered naturally-occurring asbestos along the route of the Boulder City Bypass. Containing the asbestos and monitoring the surrounding air to keep workers safe was estimated to cost at least an additional $12million (equivalent to $ in ). Work was completed without any Occupational Safety and Health Administration incidents, with 14,000 air samples taken during the construction.
On March 21, 2014, "Future I-11 Corridor" signs were installed along the US93 corridor. On May 21, 2014, NDOT submitted an application to the American Association of State Highway and Transportation Officials (AASHTO) to request the creation of the I-11 designation between the Arizona state line and the I-215/I-515 Interchange in Henderson. AASHTO approved this request at their Spring2014 Special Committee on US Route Numbering meeting, contingent on FHWA approval. On June 13, 2017, the advisory question regarding the extension of Buchanan Boulevard to I-11—including interchange plans—via Boulder City Question2 were opposed by voters. On August 16, 2017, the first southbound segment was opened to traffic, with its accompanying northbound segment opening on January 27, 2018. On February 20, 2018, NDOT opened additional ramps connecting the new Railroad Pass Casino Road to both the Boulder City Parkway (formerly US93 and US95, now US 93 Business) and to I-11 (southbound exit and northbound entrance). The final portion of Phase1—between the new casino access road and US95—opened on May 23, 2018. On August 9, 2018, Phase2 was opened to traffic, officially completing the Boulder City Bypass.
Phase2, which began construction on April 6, 2015, was expected to open by October 2018; in May2018, however, the Regional Transportation Commission of Southern Nevada (RTC) announced that the section would be open by June 2018, three months ahead of schedule. That opening date was subsequently pushed back to August 9, 2018, as it was still in the post-construction stage. In March 2019, NDOT replaced I-515 signs along its southernmost with I-11 signs.
The 80th session of the Nevada Legislature unanimously passed a bill designating the entire route of I-11 in the state as the Purple Heart Highway, which went into effect on July 1, 2019.
On June 20, 2022, NDOT decided to route I-11 along the existing alignments of I-515/US93/US95 to Downtown Las Vegas, then running concurrently with US95 northwest to SR157 rather than use I-215 or construct a new corridor as had been proposed but abandoned due to opposition. NDOT replaced I-515 shields with I-11 shields within the Las Vegas Valley in 2024 and 2025. This extended I-11 northward about and eliminated the I-515 designation.
Beginning in 2022, several construction projects were started or planned to improve the I-515 corridor before it became I-11. The projects included soundwall and retaining wall reconstruction, bridge rehabilitation and interchange improvements. All the projects are expected to be started by 2027.
Current status
, I-11 is entirely in Clark County, Nevada, extending from the Arizona state line on the Hoover Dam Bypass through Las Vegas to SR 157 northwest of the city. An extension to Mercury is currently being planned. The Nevada portion of the original I-11 corridor is a full freeway that meets current Interstate Highway standards from the Mike O'Callaghan–Pat Tillman Memorial Bridge on US 93 to the northwest of Las Vegas on US 95. While the bulk of US93 through Arizona has been widened to four lanes, some portions of the corridor are not built to Interstate Highway standards, as there are scattered at-grade intersections, substandard roadway and shoulder widths, median crossovers, and other deficiencies. Part of these dual roadways are repaved, restriped sections of very old parts of US93. Farther south, a direct system interchange with US93 and I-40 is planned to eliminate the bottleneck at Beale Street in western Kingman; once this interchange is completed and all at-grade intersections of US93 between Kingman and Hoover Dam are eliminated, I-11 will be extended south into Arizona to I-40 in Kingman. The first phase of construction began in 2024 and will finish in 2026. It will construct direct connectors from westbound I-40 to northbound US93 and from southbound US93 to eastbound I-40. The remaining movements between US93 and I-40 will continue to use the existing Beale Street interchange until traffic demands warrant and the second phase can be funded.
Phase4 of the US93 Corridor Improvement Project will finish what was started in 1998 and connect the four sections of the divided highway to Wickenburg, allowing more traffic on these congested roads. US93 will be cosigned as I-11 once it is built to Interstate standards.
Funding
The funding bill for the U.S. Department of Transportation, which replaced stopgaps that expired on June 30, 2012, officially designated I-11. This bill sped up funding for studying, engineering, and possibly building the highway. The Arizona State Legislature passed a law in 2009 that allowed private investors to team up with ADOT. In July 2012, Nevada's Transportation Board awarded $2.5million (equivalent to $ in ) in contracts to a team of consultants to study I-11's feasibility and its environmental and economic consequences.
Intermountain West corridor plans
I-11 was previously projected to serve as an Intermountain West part of the U.S.'s long-term CANAMEX Corridor transportation plans, with potential extensions south from Casa Grande to the Sonoran border, and north from Las Vegas through northern Nevada (potentially passing through Reno or Elko) and onward through either eastern Oregon–Washington or western Idaho before terminating at the Canadian border. I-11 is projected to become the Intermountain West Corridor, extending from Phoenix and Las Vegas through Reno to the Pacific Northwest via central or eastern Oregon and central Washington to the Canada–United States border. Feasibility studies for these corridor extensions began in July 2013 and were published in November 2014.
Arizona extension plans
Officials in Pima County, Arizona, supported an extension of the planned I-11 from Casa Grande, which would wrap southwest of the Tucson Mountains before meeting with I-19 in Sahuarita, south of Tucson, and continuing east to I-10. Over 800residents signed a petition opposing that west-side bypass because it would impact the Arizona-Sonora Desert Museum, Saguaro National Park, and Ironwood Forest National Monument. They recommended that I-11 be concurrent with existing I-10 route through Tucson. The additional segment would create the Tucson bypass route identified as a critical need by ADOT based upon I-10 traffic projections. In 2019, the draft tier1 environmental impact statement selected the Tucson bypass route as the recommended corridor alternative, with the corridor parallel to I-10 until Casa Grande and a connection to I-10 in Marana. Although seen as beneficial to some people, the plan to build I-11 in Arizona as a whole is still receiving pushback and conservation groups are currently suing the FHWA over the construction of the route.
Northern Nevada extension plans
The proposal to extend I-11 to the Reno area was supported by both of Nevada's U.S. Senators, Harry Reid and Dean Heller, as well as the rest of Nevada's delegation to the U.S. Congress. Heller stated that connecting the Phoenix area with Las Vegas and Northern Nevada would "spur long-term economic development, create jobs and bolster international trade". As originally proposed in the 2012 Moving Ahead for Progress in the 21st Century Act, the highway would run only from Casa Grande, Arizona, to Las Vegas. This was to provide a Las Vegas–Phoenix freeway link. Extensions of the corridor to the north toward Reno and to the south toward Nogales, however, have since been approved by the 2015 Fixing America's Surface Transportation Act (FAST Act) but not to extensions north of I-80.
The Reno City Council was informed of potential I-11 corridor plans on March 15, 2018.
North of its current terminus, I-11 is expected to follow and become co-signed with US95 from Las Vegas to Schurz or Fallon pending upgrades to Interstate standards.
North of Tonopah, the route is undecided, with various different proposed routings through Northern Nevada. These include a route through Yerington that roughly parallels SR 208 until just before the Topaz Lake area, then takes a new route into Gardnerville and Minden before meeting up with current I-580 in Carson City, which it follows to its terminus of I-80 in Reno. The other potential corridors stick closer to US 95, with one following US 95 Alternate (US95 Alt.) through Silver Springs to meet I-80 in Fernley, while another would take a new route east of Silver Springs to Fernley, meeting current US 50 Alt. west of Fallon, which would then go to I-80 and US95 Alt in Fernley. Another proposed route would go east of Mina and Luning and go north through Salt Wells before meeting US95 north of Fallon, which then meets I-80 farther north. Other minor alterations to these routes were also shown.
On July 26, 2018, NDOT selected the future northbound terminus of I-11 to I-80 and US95 Alt. in Fernley near Reno and Sparks as there are only 2 options under consideration: US95, US50 and US50 Alt. (Fernley East Connection aka Fallon option) and US95 Alt. and US50 Alt. (Fernley West Connection aka Yerington option) as the rest of them were removed from consideration.
Exit list
Old exits on I-11 were formerly exits on I-515 and US95 numbered according to US95 mileposts.