Wikipedia / Uetsu Main Line
Wikipedia / Uetsu Main Line
The is a railway line in the Tohoku and Chubu regions of Japan. Part of the East Japan Railway Company (JR East) system, it connects Niitsu Station in the city of Niigata and Akita Station in Akita. The name "Uetsu" refers to the ancient provinces of Dewa (出羽) and Echigo (越後), which the line connects.
Route data
Total length: 274.4km (170.5mi) (FukushimaAomori, TsuchizakiAkitakō)
Operators, distances:
East Japan Railway Company (Services and tracks)
Niitsu Akita: 271.7km (168.8mi)
Japan Freight Railway Company (Services and tracks)
Sakata Sakata-Minato: 2.7km (1.7mi)
Japan Freight Railway Company (Services)
Niitsu Akita: 271.7km (168.8mi)
Tracks:
See station list for details
Niitsu Murakami: 1,500 V DC
Murakami Akita: 20 kV AC, 50Hz
Maximum speed:
Niitsu Murakami: 120km/h (75mph)
Murakami Imagawa: 100km/h (62mph)
Imagawa Sanze: 95km/h (59mph)
Sanze Sakata: 120km/h (75mph)
Sakata Akita: 95km/h (59mph)
Services
Limited express, Rapid
, the following services are operated.
Local
Niitsu – Shibata: every 60-180 minutes
Shibata – Murakami: every 60-120 minutes
Murakami – Sakata: every 60-180 minutes
Sakata – Akita: every 60-180 minutes
Between Shibata and Murakami, most of the local trains travel through to/from via Hakushin Line.
Stations
A: Limited Express Inaho
B: Rapid Kairi
C: Rapid Rakuraku Train Murakami, Benibana and other Rapid service trains
".
Symbols:
| - Single-track
◇ - Single-track; station where trains can pass
^ - Double-track section starts from this point
∥ - Double-track
∨ - Single-track section starts from this point
Rolling stock
Present
Local
E129 series 2/4-car DC EMUs (Niitsu—Murakami, since December 2014)
701 series 2/3-car AC EMUs (Sakata—Akita)
KiHa 110 series (Niitsu - Nezugaseki)
GV-E400 series (Niitsu-Sakata, since August 2019)
Inaho/Rakuraku Train Murakami
E653-1000 series 7-car DC/AC EMUs (since September 2013)
Kairi
Former
115 series DC EMUs (Niitsu—Murakami, until March 2018)
E127-0 series 2-car DC EMUs (Shibata—Murakami, until March 2015)
KiHa 40/47/48 series DMUs (Until March 2020)
KiHa E120 DMUs (Niitsu—Sakata, until March 2018)
KiHa 58 series DMUs
KiHa 52 DMUs
485 series DC/AC EMUs (until July 2014) - Inaho, Hakucho, Rakuraku Train Murakami
History
The line was opened in sections between 1912 and 1924, and electrified in 1972, the same year CTC signalling was commissioned.
Work to double-track the line in sections commenced in 1957, and continued for 25 years until being suspended due to capital expenditure restrictions in 1983, at which time 51% of the route was double-tracked.
On July 28, 2022, JR East announced that ridership in some sectors was less than 2000 persons/day, the deficit for the sector between Murakami Station to Tsuruoka Station being 4,990 billion yen, the largest deficit within the JR East system.
Accidents
On December 25, 2005, all six cars of a limited express train Inaho No.14 on the Uetsu Line derailed in Yamagata prefecture, about north of Tokyo. The train was headed south towards Kita-Amarume Station. Three of the cars turned over, causing the deaths of five people and injuring 33 others. Three other persons were originally reported missing, but authorities later discovered that they had disembarked from the train before the accident. It is likely that the event was caused by a tornado although it is uncertain whether or not a tornado was involved with this accident.
References
External links