arvau

Wikipedia / Tennessee State Route 52

State Route 52 (SR52) is an east–west state highway that crosses nine counties in northern and northeastern Tennessee. The route originates in Orlinda along SR 49 and ends in Elgin along U.S. Route 27 (US27).

SR52 is mostly a primary route, but becomes secondary west of I-65. Between Celina and Livingston it is part of Corridor J of the Appalachian Development Highway System.

Route description

In the border counties

SR52 begins as a secondary state route in Orlinda at SR 49 in Robertson County. It begins an eastward trek and junctions with I-65 (Exit117) west of Portland. A short distance later, it junctions with US 31W (SR 41) and enters Sumner County. Once it does so, it becomes a primary route. SR 52 then enters Portland and has an Intersection with SR 109. Continuing east, SR52 enters Westmoreland, bypassing the downtown area to the south, and comes to an intersection with US 31E/231 (SR 6). It then crosses into Macon County and passes through Siloam. SR52 continues into Lafayette to intersect with SR 10. It then exits Lafayette and intersects with SR 262 at Webbtown. It continues to Red Boiling Springs, where it has a junction with SR 56. It then has an interchange with SR 151 a short distance later. It continues eastward into Clay County, and goes through the communities of Hermitage Springs and Moss, the latter of which SR 51 intersects SR52, and SR 135 intersects SR52 in the former. SR 53 intersects SR52 at Celina.

For SR52’s first , it parallels the Tennessee-Kentucky state line.

Celina to Elgin

After exiting Celina, SR52 turns southeast to cross into Overton County. A short distance from the county line, it comes to a junction with SR 136 just north of Standing Stone State Park. It continues east and passes through Allons. SR52 then enters Livingston and intersects with SR 111. It continues into downtown and becomes concurrent with SR 85. It continues east and goes through Alpine and separates from SR85 to the east. SR52 then continues eastward into far southern Pickett County, and then crosses into Fentress County shortly thereafter. It winds to the east to Jamestown, where it has an intersection with SR 154. It then goes straight through downtown, crosses Main St. (Old US127), and has an interchange with US 127 (SR 28) just east of downtown. SR52 then goes southeast, and enters Allardt to intersect SR 296. It then continues on known as "Rugby Pike", which is the name it keeps all the way to its eastern end. It continues through rural Fentress county to a tall bridge over the Clear Fork River and crosses into Morgan County and the Eastern Time Zone. A short distance past the river, SR52 intersects Rugby Parkway, which until December 2013 was the actual route of SR52, which runs a loop through the historic community of Rugby, while the current route runs along a new bypass to the south. SR52 then becomes very narrow and curvy and straddles Morgan County's eastern boundary line for several miles before finally entering Scott County to end in the community of Elgin at an intersection with US 27 (SR 29).

History

Pre-1930

From 1915 until the mid-1920s, SR52 followed a path from Hartsville, in Trousdale County, to Lafayette, along with its late-20th century alignments from Lafayette to Livingston. The route was extended to its pre-2010 alignments by 1930; the Hartsville-to-Lafayette route is now signed as SR 10.

Until the late 1920s, SR52's course from Orlinda to Portland, along with SR49's run from Orlinda to Springfield, was signed as SR 75. The SR75 designation has since been reassigned to a state highway in northeastern Tennessee.

Re-alignments of SR 52 (2010s)

Sometime between 2010 and 2013, SR52 in Red Boiling Springs was rerouted onto a bypass route to the south of that city. Most of the old alignment, however, still retains its SR56 designation through the town. Several other older alignments of SR52 still remain in Macon and northern Sumner Counties, including Church Street in Lafayette, and Austin Peay Highway near Westmoreland.

In December 2013, the town of Rugby was bypassed by the rerouting of SR52, with the old alignment now being known as Rugby Parkway.

SR52 in eastern Clay County was rerouted onto a new, straighter four-lane divided alignment from the eastern outskirts of Celina to the Overton County line. Until that project was finished in the early 2010s, SR52 ran concurrently with SR53 on the south side of town for a little more than . The old alignment southeast of Celina is now known as Old Livingston Highway. Parts of an even older alignment of SR52 in Clay County still remains intact also. All re-routings shortened the route by an estimated total of from the previously listed .

Major intersections

Related route

State Route 52 Truck Route (SR 52 Truck) is a truck route in downtown Celina, in Clay County. With a total length of , the truck route includes the following streets:

  • Dow Avenue from SR 52 (Main St./Dow Ave.) to Brown Street, and

  • Brown Street from Dow Avenue to Lake Avenue.

The route folds back into SR 52 at the corner of Brown Street and Lake Avenue.

References