arvau

Wikipedia / Ariane 5

Ariane 5 () is a retired European heavy-lift space launch vehicle operated by Arianespace for the European Space Agency (ESA). It was launched from the Guiana Space Centre (CSG) in French Guiana. It was used to deliver payloads into geostationary transfer orbit (GTO), low Earth orbit (LEO) or further into space. The launch vehicle had a streak of 82 consecutive successful launches between 9 April 2003 and 12 December 2017. In development since 2014, Ariane 6, a direct successor system was first launched in 2024.

The system was designed as an expendable launch vehicle by the Centre National d'Études Spatiales (CNES), the French government's space agency, in cooperation with various European partners. Despite not being a direct derivative of its predecessor launch vehicle program, it was classified as part of the Ariane rocket family. Aérospatiale, and later ArianeGroup, was the prime contractor for the manufacturing of the vehicles, leading a multi-country consortium of other European contractors. Ariane 5 was originally intended to launch the Hermes spacecraft, and thus it was rated for human space launches.

Since its first launch, Ariane 5 was refined in successive versions: "G", "G+", "GS", "ECA", and finally, "ES". The system had a commonly used dual-launch capability, where up to two large geostationary belt communication satellites can be mounted using a SYLDA (Système de Lancement Double Ariane, meaning "Ariane Double-Launch System") carrier system. Up to three, somewhat smaller, main satellites are possible depending on size using a SPELTRA (Structure Porteuse Externe Lancement Triple Ariane, which translates to "Ariane Triple-Launch External Carrier Structure"). Up to eight secondary payloads, usually small experiment packages or minisatellites, could be carried with an ASAP (Ariane Structure for Auxiliary Payloads) platform.

Following the launch of 15 August 2020, Arianespace signed the contracts for the last eight Ariane 5 launches, before it was succeeded by the new Ariane 6 launcher, according to Daniel Neuenschwander, director of space transportation at the ESA. Ariane 5 flew its final mission on 5 July 2023.

Vehicle description

Cryogenic main stage

Ariane 5's cryogenic H173 main stage (H158 for Ariane 5G, G+, and GS) was called the EPC (Étage Principal Cryotechnique — Cryotechnic Main Stage). It consisted of a diameter by high tank with two compartments, one for liquid oxygen and one for liquid hydrogen, and a Vulcain 2 (Vulcain 1 for Ariane 5G, G+, and GS) engine at the base with a vacuum thrust of . The H173 EPC weighed about , including of propellant. After the main cryogenic stage runs out of fuel, it re-entered the atmosphere for an ocean splashdown.

Solid boosters

Attached to the sides were two P241 (P238 for Ariane 5G and G+) solid rocket boosters (SRBs or EAPs from the French Étages d'Accélération à Poudre — ), each weighing about full and delivering a thrust of about . They were fueled by a mix of ammonium perchlorate (68%) and aluminium fuel (18%) and HTPB (14%). They each burned for 130 seconds before being dropped into the ocean. The SRBs were usually allowed to sink to the bottom of the ocean, but, like the Space Shuttle Solid Rocket Boosters, they could be recovered with parachutes, and this was occasionally done for post-flight analysis. Unlike Space Shuttle SRBs, Ariane 5 boosters were not reused. The most recent attempt was for the first Ariane 5 ECA mission in 2009. One of the two boosters was successfully recovered and returned to the Guiana Space Center for analysis. Prior to that mission, the last such recovery and testing was done in 2003.

The French M51 submarine-launched ballistic missile (SLBM) shared a substantial amount of technology with these boosters.

In February 2000, the suspected nose cone of an Ariane 5 booster washed ashore on the South Texas coast, and was recovered by beachcombers before the government could get to it.

Second stage

The second stage was on top of the main stage and below the payload. The original Ariane — Ariane 5G — used the EPS (Étage à Propergols Stockables — Storable Propellant Stage), which was fueled by monomethylhydrazine (MMH) and nitrogen tetroxide, containing of storable propellant. The EPS was subsequently improved for use on the Ariane 5G+, GS, and ES.

The EPS upper stage was capable of repeated ignition, first demonstrated during flight V26 which was launched on 5 October 2007. This was purely to test the engine, and occurred after the payloads had been deployed. The first operational use of restart capability as part of a mission came on 9 March 2008, when two burns were made to deploy the first Automated Transfer Vehicle (ATV) into a circular parking orbit, followed by a third burn after ATV deployment to de-orbit the stage. This procedure was repeated for all subsequent ATV flights.

Ariane 5ECA used the ESC (Étage Supérieur Cryotechnique — Cryogenic Upper Stage), which was fueled by liquid hydrogen and liquid oxygen. The ESC used the HM7B engine previously used in the Ariane 4 third stage. The propellent load of 14.7 tonne allowed the engine to burn for 945 seconds while providing 6.5 tonne of thrust. The ESC provided roll control during powered flight and full attitude control during payload separation using hydrogen gas thrusters. Oxygen gas thrusters allowed longitudinal acceleration after engine cutoff. The flight assembly included the Vehicle Equipment Bay, with flight electronics for the entire rocket, and the payload interface and structural support.

Fairing

The payload and all upper stages were covered at launch by a fairing for aerodynamic stability and protection from heating during supersonic flight and acoustic loads. It was jettisoned once sufficient altitude has been reached, typically above . It was made by Ruag Space and since flight VA-238 it was composed of 4 panels.

Launch preparations

With the exception of the solid rocket boosters (for safety and cost reasons), the components were assembled in Europe, and then shipped to French Guyana by boat. Once at Kourou, the components were assembled in the Launcher Integration Building (BIL), then transferred into the Final Assembly Building (BAF) for mating the payload and fairing, before the completed rocket was transferred to the Launch Zone (ZL) for fueling and launch.

Variants

Variant

Description

G

The original version was dubbed Ariane 5G (Generic) and had a launch mass of . Its payload capability to geostationary transfer orbit (GTO) was for a single satellite or for dual launches. It flew 16 times with one failure and two partial failures.

G+

The Ariane 5G+ had an improved EPS second stage, with a GTO capacity of for a single payload or for two. It flew three times in 2004, with no failures.

GS

At the time of the failure of the first Ariane 5ECA flight in 2002, all Ariane 5 launchers in production were ECA versions. Some of the ECA cores were modified to use the original Vulcain engine and tank volumes while the failure was investigated; these vehicles were designated Ariane 5GS. The GS used the improved EAP boosters of the ECA variant and the improved EPS of the G+ variant, but the increased mass of the modified ECA core compared to the G and G+ core resulted in slightly reduced payload capacity. Ariane 5GS could carry a single payload of or a dual payload of to GTO. The Ariane 5GS flew 6 times from 2005 to 2009 with no failures.

ECA

The Ariane 5ECA (Evolution Cryotechnique type A), first flown in 2002 but ending in failure, and first successfully flown in 2005, used an improved Vulcain 2 first-stage engine with a longer, more efficient nozzle with a more efficient flow cycle and denser propellant ratio. The new ratio required length modifications to the first-stage tanks. The EPS second stage was replaced by the ESC-A (Etage Supérieur Cryogénique-A), which had a dry weight of and was powered by an HM-7B engine burning of cryogenic propellant. The ESC-A used the liquid oxygen tank and lower structure from the Ariane 4's H10 third stage, mated to a new liquid hydrogen tank. Additionally, the EAP booster casings were lightened with new welds and carry more propellant. The Ariane 5ECA started with a GTO launch capacity of for dual payloads or for a single payload. Later batches: PB+ and PC, increased the max payload to GTO to . The Ariane 5 ECA flew 72 times from 2002 to 2019 with one failure and one partial failure.

ECA+

The Ariane 5ECA+ (Evolution Cryotechnique type A+), first successfully flown in 2019, used an improved ESC-D (Etage Supérieur Cryogénique-D).

ES

The Ariane 5ES (Evolution Storable) had an estimated LEO launch capacity of . It included all the performance improvements of Ariane 5ECA core and boosters but replaced the ESC-A second stage with the restartable EPS used on Ariane 5GS variants. It was used to launch the Automated Transfer Vehicle (ATV) into a circular low Earth orbit inclined at 51.6° and was used 3 times to launch 4 Galileo navigation satellites at a time directly into their operational orbit. The Ariane 5ES flew 8 times from 2008 to 2018 with no failures.

ME(cancelled)

The Ariane 5ME (Mid-life Evolution) was under development until December 2014 when funding was cut in favour of developing Ariane 6. Last activities for Ariane 5ME were completed at the end of 2015. Vinci upper stage engine, under development for the 5ME, transferred to Ariane 6.

Launch pricing and market competition

, the Ariane 5 commercial launch price for launching a "midsize satellite in the lower position" was approximately €50 million, competing for commercial launches in an increasingly competitive market.

The heavier satellite was launched in the upper position on a typical dual-satellite Ariane 5 launch and was priced higher than the lower satellite, on the order of €90 million .

Total launch price of an Ariane 5 – which could transport up to two satellites to space, one in the "upper" and one in the "lower" positions – was around €150 million .

Cancelled plans for future developments

Ariane 5 ME

The Ariane 5 ME (Mid-life Evolution) was in development into early 2015, and was seen as a stopgap between Ariane 5ECA/Ariane 5ES and the new Ariane 6. With first flight planned for 2018, it would have become ESA's principal launcher until the arrival of the new Ariane 6 version. ESA halted funding for the development of Ariane 5ME in late 2014 to prioritize development of Ariane 6.

The Ariane 5ME was to use a new upper stage, with increased propellant volume, powered by the new Vinci engine. Unlike the HM-7B engine, it was to be able to restart several times, allowing for complex orbital maneuvers such as insertion of two satellites into different orbits, direct insertion into geosynchronous orbit, planetary exploration missions, and guaranteed upper stage deorbiting or insertion into graveyard orbit. The launcher was also to include a lengthened fairing up to and a new dual launch system to accommodate larger satellites. Compared to an Ariane 5ECA model, the payload to GTO was to increase by 15% to and the cost-per-kilogram of each launch was projected to decline by 20%.

Development

Originally known as the Ariane 5ECB, Ariane 5ME was to have its first flight in 2006. However, the failure of the first ECA flight in 2002, combined with a deteriorating satellite industry, caused ESA to cancel development in 2003. Development of the Vinci engine continued, though at a lower pace. The ESA Council of Ministers agreed to fund development of the new upper stage in November 2008.

In 2009, EADS Astrium was awarded a €200 million contract, and on 10 April 2012 received another €112 million contract to continue development of the Ariane 5ME with total development effort expected to cost €1 billion.

On 21 November 2012, ESA agreed to continue with the Ariane 5ME to meet the challenge of lower priced competitors. It was agreed the Vinci upper stage would also be used as the second stage of a new Ariane 6, and further commonality would be sought. Ariane 5ME qualification flight was scheduled for mid-2018, followed by gradual introduction into service.

On 2 December 2014, ESA decided to stop funding the development of Ariane 5ME and instead focus on Ariane 6, which was expected to have a lower cost per launch and allow more flexibility in the payloads (using two or four P120C solid boosters depending on total payload mass).

Solid propellant stage

Work on the Ariane 5 EAP motors was continued in the Vega programme. The Vega 1st stage engine – the P80 engine – was a shorter derivation of the EAP. The P80 booster casing was made of filament wound graphite epoxy, much lighter than the current stainless steel casing. A new composite steerable nozzle was developed while new thermal insulation material and a narrower throat improved the expansion ratio and subsequently the overall performance. Additionally, the nozzle had electromechanical actuators which replaced the heavier hydraulic ones used for thrust vector control.

These developments could maybe have made their way back into the Ariane programme, but this was most likely an inference based on early blueprints of the Ariane 6 having a central P80 booster and 2-4 around the main one. The incorporation of the ESC-B with the improvements to the solid motor casing and an uprated Vulcain engine would have delivered to LEO. This would have been developed for any lunar missions but the performance of such a design might not have been possible if the higher Max-Q for the launch of this launch vehicle would have posed a constraint on the mass delivered to orbit.

Ariane 6

The design brief of the next generation launch vehicle Ariane 6 called for a lower-cost and smaller launch vehicle capable of launching a single satellite of up to to GTO. However, after several permutations the finalized design was nearly identical in performance to the Ariane 5, focusing instead on lowering fabrication costs and launch prices. , Ariane 6 was projected to be launched for about €70 million per flight, about half of the Ariane 5 price.

Initially development of Ariane 6 was projected to cost €3.6 billion. In 2017, the ESA set 16 July 2020 as the deadline for the first flight. The Ariane 6 successfully completed its maiden flight on 9 July 2024.

Notable launches

Ariane 5's first test flight (Ariane 5 Flight 501) on 4 June 1996 failed, with the rocket self-destructing 37 seconds after launch because of a malfunction in the control software. A data conversion from 64-bit floating-point value to 16-bit signed integer value to be stored in a variable representing horizontal bias caused a processor trap (operand error) because the floating-point value was too large to be represented by a 16-bit signed integer. The software had been written for the Ariane 4 where efficiency considerations (the computer running the software had an 80% maximum workload requirement) led to four variables being protected with a handler while three others, including the horizontal bias variable, were left unprotected because it was thought that they were "physically limited or that there was a large margin of safety". The software, written in Ada, was included in the Ariane 5 through the reuse of an entire Ariane 4 subsystem despite the fact that the particular software containing the bug, which was just a part of the subsystem, was not required by the Ariane 5 because it has a different preparation sequence than the Ariane 4.

The second test flight (L502, on 30 October 1997) was a partial failure. The Vulcain nozzle caused a roll problem, leading to premature shutdown of the core stage. The upper stage operated successfully, but it could not reach the intended orbit. A subsequent test flight (L503, on 21 October 1998) proved successful and the first commercial launch (L504) occurred on 10 December 1999 with the launch of the XMM-Newton X-ray observatory satellite.

Another partial failure occurred on 12 July 2001, with the delivery of two satellites into an incorrect orbit, at only half the height of the intended GTO. The ESA Artemis telecommunications satellite was able to reach its intended orbit on 31 January 2003, through the use of its experimental ion propulsion system.

The next launch did not occur until 1 March 2002, when the Envisat environmental satellite successfully reached an orbit of above the Earth in the 11th launch. At , it was the heaviest single payload until the launch of the first ATV on 9 March 2008, at .

The first launch of the ECA variant on 11 December 2002 ended in failure when a main booster problem caused the rocket to veer off-course, forcing its self-destruction three minutes into the flight. Its payload of two communications satellites (STENTOR and Hot Bird 7), valued at about €630 million, was lost in the Atlantic Ocean. The fault was determined to have been caused by a leak in coolant pipes allowing the nozzle to overheat. After this failure, Arianespace SA delayed the expected January 2003 launch for the Rosetta mission to 26 February 2004, but this was again delayed to early March 2004 due to a minor fault in the foam that protects the cryogenic tanks on the Ariane 5. The failure of the first ECA launch was the last failure of an Ariane 5 until flight 241 in January 2018.

On 27 September 2003, the last Ariane 5G boosted three satellites (including the first European lunar probe, SMART-1), in Flight 162. On 18 July 2004, an Ariane 5G+ boosted what was at the time the heaviest telecommunication satellite ever, Anik F2, weighing almost .

The first successful launch of the Ariane 5ECA took place on 12 February 2005. The payload consisted of the XTAR-EUR military communications satellite, a 'SLOSHSAT' small scientific satellite and a MaqSat B2 payload simulator. The launch had been scheduled for October 2004, but additional testing and a military launch (of a Helios 2A observation satellite) delayed the attempt.

On 11 August 2005, the first Ariane 5GS (featuring the Ariane 5ECA's improved solid motors) boosted Thaicom 4, the heaviest telecommunications satellite to date at , into orbit.

On 16 November 2005, the third Ariane 5ECA launch (the second successful ECA launch) took place. It carried a dual payload consisting of Spaceway F2 for DirecTV and Telkom-2 for PT Telekomunikasi of Indonesia. This was the launch vehicle's heaviest dual payload to date, at more than .

On 27 May 2006, an Ariane 5ECA launch vehicle set a new commercial payload lifting record of . The dual-payload consisted of the Thaicom 5 and Satmex 6 satellites.

On 4 May 2007, the Ariane 5ECA set another new commercial record, lifting into transfer orbit the Astra 1L and Galaxy 17 communication satellites with a combined weight of , and a total payload weight of . This record was again broken by another Ariane 5ECA, launching the Skynet 5B and Star One C1 satellites, on 11 November 2007. The total payload weight for this launch was of .

On 9 March 2008, the first Ariane 5ES-ATV was launched to deliver the first ATV called Jules Verne to the International Space Station (ISS). The ATV was the heaviest payload ever launched by a European launch vehicle, providing supplies to the space station with necessary propellant, water, air and dry cargo. This was the first operational Ariane mission which involved an engine restart in the upper stage. The ES-ATV Aestus EPS upper stage was restartable while the ECA HM7-B engine was not.

On 1 July 2009, an Ariane 5ECA launched TerreStar-1 (now EchoStar T1), which was then, at , the largest and most massive commercial telecommunication satellite ever built at that time until being overtaken by Telstar 19 Vantage, at , launched aboard Falcon 9. The satellite was launched into a lower-energy orbit than a usual GTO, with its initial apogee at roughly .

On 28 October 2010, an Ariane 5ECA launched Eutelsat's W3B (part of its W Series of satellites) and Broadcasting Satellite System Corporation (B-SAT)'s BSAT-3b satellites into orbit. But the W3B satellite failed to operate shortly after the successful launch and was written off as a total loss due to an oxidizer leak in the satellite's main propulsion system. The BSAT-3b satellite, however, is operating normally.

The VA253 launch on 15 August 2020 introduced two small changes that increased lift capacity by about ; these were a lighter avionics and guidance-equipment bay, and modified pressure vents on the payload fairing, which were required for the subsequent launch of the James Webb Space Telescope. It also debuted a location system using Galileo navigation satellites.

On 25 December 2021, VA256 launched the James Webb Space Telescope towards a Sun–Earth L2 halo orbit. The precision of trajectory following launch led to fuel savings credited with potentially doubling the lifetime of the telescope by leaving more hydrazine propellant on board for station-keeping than was expected. According to Rudiger Albat, the program manager for Ariane 5, efforts had been made to select components for this flight that had performed especially well during pre-flight testing, including "one of the best Vulcain engines that we've ever built."

GTO payload weight records

On 22 April 2011, the Ariane 5ECA flight VA-201 broke a commercial record, lifting Yahsat 1A and Intelsat New Dawn with a total payload weight of to transfer orbit. This record was later broken again during the launch of Ariane 5ECA flight VA-208 on 2 August 2012, lifting a total of into the planned geosynchronous transfer orbit, which was broken again 6 months later on flight VA-212 with sent towards geosynchronous transfer orbit. In June 2016, the GTO record was raised to , on the first rocket in history that carried a satellite dedicated to financial institutions. The payload record was pushed a further , up to on 24 August 2016 with the launch of Intelsat 33e and Intelsat 36. On 1 June 2017, the payload record was broken again to carrying ViaSat-2 and Eutelsat-172B. In 2021 VA-255 put 11,210kg into GTO.

VA241 anomaly

On 25 January 2018, an Ariane 5ECA launched SES-14 and Al Yah 3 satellites. About 9 minutes and 28 seconds after launch, a telemetry loss occurred between the launch vehicle and the ground controllers. It was later confirmed, about 1 hour and 20 minutes after launch, that both satellites were successfully separated from the upper stage and were in contact with their respective ground controllers, but that their orbital inclinations were incorrect as the guidance systems might have been compromised. Therefore, both satellites conducted orbital procedures, extending commissioning time. SES-14 needed about 8 weeks longer than planned commissioning time, meaning that entry into service was reported early September instead of July. Nevertheless, SES-14 is still expected to be able to meet the designed lifetime. This satellite was originally to be launched with more propellant reserve on a Falcon 9 launch vehicle since the Falcon 9, in this specific case, was intended to deploy this satellite into a high inclination orbit that would require more work from the satellite to reach its final geostationary orbit. The Al Yah 3 was also confirmed healthy after more than 12 hours without further statement, and like SES-14, Al Yah 3's maneuvering plan was also revised to still fulfill the original mission. As of 16 February 2018, Al Yah 3 was approaching the intended geostationary orbit, after series of recovery maneuvers had been performed. The investigation showed that invalid inertial units' azimuth value had sent the vehicle 17° off course but to the intended altitude, they had been programmed for the standard geostationary transfer orbit of 90° when the payloads were intended to be 70° for this supersynchronous transfer orbit mission, 20° off norme. This mission anomaly ended the 82 consecutive launch success streak from 2003.

Launch history

Launch statistics

Ariane 5 launch vehicles had accumulated 117 launches, 112 of which were successful, yielding a success rate. Between April 2003 and December 2017, Ariane 5 flew 83 consecutive missions without failure, but the launch vehicle suffered a partial failure in January 2018.

Rocket configurations

Launch outcomes

List of launches

All launches are from Guiana Space Centre, ELA-3.

#

Flight no.

DateTime (UTC)

Serial no.

Payload

Total payload mass (including launch adapters and SYLDA)

Orbit

Customers

Launchoutcome

1

V-88

4 June 199612:34

G501

Cluster

Maiden flight of Ariane 5, guidance system failed due to programming error, destroyed by range safety.

2

V-101

30 October 199713:43

G502

MaqSat-H, TEAMSAT, MaqSat-B, YES

First Ariane 5 flight to reach orbit. Upper stage underperformed, placed satellites in lower orbit than planned.

3

V-112

21 October 199816:37

G503

MaqSat 3, ARD

~6,800kg

GTO

First fully successful Ariane 5 launch. Contained ARD as a rideshare, designed to test reentry.

4

V-119

10 December 199914:32

G504

XMM-Newton

3,800kg

HEO

Part of Horizon 2000 program, a space telescope designed to perform x-ray astronomy.

5

V-128

21 March 200023:28

G505

INSAT-3BAsiaStar

~5,800kg

GTO

First Ariane 5 night launch.

6

V-130

14 September 200022:54

G506

Astra 2BGE-7

~4,700kg

GTO

7

V-135

16 November 200001:07

G507

PanAmSat-1RAmsat-P3DSTRV 1CSTRV 1D

~6,600kg

GTO

8

V-138

20 December 200000:26

G508

Astra 2DGE-8LDREX

~4,700kg

GTO

9

V-140

8 March 200122:51

G509

Eurobird-1BSAT-2a

~5,400kg

GTO

10

V-142

12 July 200121:58

G510

ArtemisBSAT-2b

~5,400kg

GTO (planned)MEO (achieved)

Upper stage underperformed, payloads were placed in an unusable orbit. Artemis was raised to its target orbit at the expense of operational fuel; BSAT-2b was not recoverable.

11

V-145

1 March 200201:07

G511

Envisat

8,111kg

SSO

Earth observation satellite designed to succeed the two European Remote-Sensing Satellites. Largest civilian observation satellite launched.

12

V-153

5 July 200223:22

G512

Stellat 5N-STAR c

~6,700kg

GTO

13

V-155

28 August 200222:45

G513

Atlantic Bird 1MSG-1MFD

~5,800kg

GTO

14

V-157

11 December 200222:22

ECA517

Hot Bird 7STENTORMFD-AMFD-B

GTO (planned)

Maiden flight of Ariane 5ECA, first stage engine failure, rocket destroyed by range safety.

15

V-160

9 April 200322:52

G514

INSAT-3AGalaxy 12

~5,700kg

GTO

16

V-161

11 June 200322:38

G515

Optus C1BSAT-2c

~7,100kg

GTO

17

V-162

27 September 200323:14

G516

INSAT-3EeBird-1SMART-1

~5,600kg

GTO

Final flight of Ariane 5G

18

V-158

2 March 200407:17

G+518

RosettaPhilae

3,011kg

Heliocentric

Maiden flight of Ariane 5G+. Part of the Horizon 2000 program, designed to explore comet 67P/Churyumov–Gerasimenko. First spacecraft to orbit (and with Philae, first to land on) a comet, and first non-NASA spacecraft to reach the outer solar system. First Ariane 5 launch into heliocentric orbit.

19

V-163

18 July 200400:44

G+519

Anik F2

5,950kg

GTO

20

V-165

18 December 200416:26

G+520

Helios 2AEssaim-1Essaim-2Essaim-3Essaim-4PARASOLNanosat 01

4,200kg

SSO

Final flight of Ariane 5G+

21

V-164

12 February 200521:03

ECA521

XTAR-EURMaqsat-B2Sloshsat-FLEVO

~8,400kg

GTO

22

V-166

11 August 200508:20

GS523

Thaicom 4

6,485kg

GTO

Maiden flight of Ariane 5GS

23

V-168

13 October 200522:32

GS524

Syracuse 3AGalaxy 15

~6,900kg

GTO

24

V-167

16 November 200523:46

ECA522

Spaceway-2Telkom-2

~9,100kg

GTO

25

V-169

21 December 200523:33

GS525

INSAT-4AMSG-2

6,478kg

GTO

26

V-170

11 March 200622:33

ECA527

SpainsatHot Bird 7A

~8,700kg

GTO

27

V-171

27 May 200621:09

ECA529

Satmex-6Thaicom 5

9,172kg

GTO

28

V-172

11 August 200622:15

ECA531

JCSAT-10Syracuse 3B

~8,900kg

GTO

29

V-173

13 October 200620:56

ECA533

DirecTV-9SOptus D1LDREX-2

~9,300kg

GTO

30

V-174

8 December 200622:08

ECA534

WildBlue-1AMC-18

~7,800kg

GTO

31

V-175

11 March 200722:03

ECA535

Skynet 5AINSAT-4B

~8,600kg

GTO

32

V-176

4 May 200722:29

ECA536

Astra 1LGalaxy 17

9,402kg

GTO

33

V-177

14 August 200723:44

ECA537

Spaceway-3BSAT-3a

8,848kg

GTO

34

V-178

5 October 200722:02

GS526

Intelsat 11Optus D2

5,857kg

GTO

35

V-179

14 November 200722:03

ECA538

Skynet 5BStar One C1

9,535kg

GTO

36

V-180

21 December 200721:41

GS530

Rascom-QAF1Horizons-2

~6,500kg

GTO

37

V-181

9 March 200804:03

ES528

Jules Verne ATV

LEO (ISS)

Maiden flight of Ariane 5ES. First flight of the Automated Transfer Vehicle, going to the International Space Station. Made Kourou the third launch site (after Baikonur and Cape Canaveral/KSC) to launch a payload to the ISS.

38

V-182

18 April 200822:17

ECA539

Star One C2Vinasat-1

7,762kg

GTO

39

V-183

12 June 200822:05

ECA540

Skynet 5CTürksat 3A

8,541kg

GTO

40

V-184

7 July 200821:47

ECA541

ProtoStar-1Badr-6

8,639kg

GTO

41

V-185

14 August 200820:44

ECA542

Superbird-7AMC-21

8,068kg

GTO

42

V-186

20 December 200822:35

ECA543

Hot Bird 9Eutelsat W2M

9,220kg

GTO

43

V-187

12 February 200922:09

ECA545

Hot Bird 10NSS-9Spirale-ASpirale-B

8,511kg

GTO

44

V-188

14 May 200913:12

ECA546

Herschel Space ObservatoryPlanck

3,402kg

Sun–Earth

Both part of the Horizon 2000 program, both space telescopes. Herschel designed to perform infrared astronomy, Planck designed to measure the cosmic microwave background.

45

V-189

1 July 200919:52

ECA547

TerreStar-1

7,055kg

GTO

46

V-190

21 August 200922:09

ECA548

JCSAT-12Optus D3

7,655kg

GTO

47

V-191

1 October 200921:59

ECA549

Amazonas 2COMSATBw-1

9,087kg

GTO

48

V-192

29 October 200920:00

ECA550

NSS-12Thor-6

9,462kg

GTO

49

V-193

18 December 200916:26

GS532

Helios 2B

5,954kg

SSO

Final flight of Ariane 5GS

50

V-194

21 May 201022:01

ECA551

Astra 3BCOMSATBw-2

9,116kg

GTO

SESMilSat Services

51

V-195

26 June 201021:41

ECA552

Arabsat-5AChollian

8,393kg

GTO

ArabsatKARI

52

V-196

4 August 201020:59

ECA554

Nilesat 201RASCOM-QAF 1R

7,085kg

GTO

NilesatRASCOM

53

V-197

28 October 201021:51

ECA555

Eutelsat W3BBSAT-3b

8,263kg

GTO

EutelsatBroadcasting Satellite System Corporation

Eutelsat W3B suffered a leak in the propulsion system shortly after launch and was declared a total loss. BSAT-3b is operating normally.

54

V-198

26 November 201018:39

ECA556

Intelsat 17HYLAS-1

8,867kg

GTO

IntelsatAvanti Communications

55

V-199

29 December 201021:27

ECA557

Koreasat 6Hispasat-1E

9,259kg

GTO

KT CorporationHispasat

56

V-200

16 February 201121:50

ES544

Johannes Kepler ATV

20,050kg

LEO (ISS)

ESA

ISS resupply flight.

57

VA-201

22 April 201121:37

ECA558

Yahsat 1ANew Dawn

10,064kg

GTO

Al Yah Satellite CommunicationsIntelsat

Launch was scrubbed from 30 March 2011, aborted in the last seconds before liftoff due to a gimbal malfunction in the Vulcain main engine.

58

VA-202

20 May 201120:38

ECA559

ST-2GSAT-8

9,013kg

GTO

Singapore TelecomISRO

59

VA-203

6 August 201122:52

ECA560

Astra 1NBSAT-3c / JCSAT-110R

9,095kg

GTO

SESBroadcasting Satellite System Corporation

60

VA-204

21 September 201121:38

ECA561

Arabsat-5CSES-2

8,974kg

GTO

Arab Satellite Communications OrganizationSES

61

VA-205

23 March 201204:34

ES553

Edoardo Amaldi ATV

20,060kg

LEO (ISS)

ESA

ISS resupply flight.

62

VA-206

15 May 201222:13

ECA562

JCSAT-13Vinasat-2

8,381kg

GTO

SKY Perfect JSATVNPT

63

VA-207

5 July 201221:36

ECA563

EchoStar XVIIMSG-3

9,647kg

GTO

EchoStarEUMETSAT

64

VA-208

2 August 201220:54

ECA564

Intelsat 20HYLAS 2

10,182kg

GTO

IntelsatAvanti Communications

65

VA-209

28 September 201221:18

ECA565

Astra 2FGSAT-10

10,211kg

GTO

SESISRO

66

VA-210

10 November 201221:05

ECA566

Eutelsat 21BStar One C3

9,216kg

GTO

EutelsatStar One

67

VA-211

19 December 201221:49

ECA567

Skynet 5DMexsat-3

8,637kg

GTO

AstriumMexican Satellite System

68

VA-212

7 February 201321:36

ECA568

Amazonas 3Azerspace-1/Africasat-1a

10,350kg

GTO

HispasatAzercosmos

69

VA-213

5 June 201321:52

ES592

Albert Einstein ATV

20,252kg

LEO (ISS)

ESA

ISS resupply flight.

70

VA-214

25 July 201319:54

ECA569

Alphasat I-XLINSAT-3D

9,760kg

GTO

InmarsatISRO

71

VA-215

29 August 201320:30

ECA570

Eutelsat 25B/Es'hail 1GSAT-7

9,790kg

GTO

EutelsatISRO

72

VA-217

6 February 201421:30

ECA572

ABS-2Athena-Fidus

10,214kg

GTO

ABS (satellite operator)DIRISI

73

VA-216

22 March 201422:04

ECA571

Astra 5BAmazonas 4A

9,579kg

GTO

SESHispasat

74

VA-219

29 July 201423:47

ES593

Georges Lemaître ATV

20,293kg

LEO (ISS)

ESA

ISS resupply flight. Final launch of the Automated Transfer Vehicle.

75

VA-218

11 September 201422:05

ECA573

MEASAT-3bOptus 10

10,088kg

GTO

MEASAT Satellite SystemsOptus

76

VA-220

16 October 201421:43

ECA574

Intelsat 30ARSAT-1

10,060kg

GTO

IntelsatARSAT

77

VA-221

6 December 201420:40

ECA575

DirecTV-14GSAT-16

10,210kg

GTO

DirecTVISRO

78

26 April 201520:00

ECA576

Thor 7SICRAL-2

9,852kg

GTO

British Satellite BroadcastingFrench Armed Forces

79

VA-223

27 May 201521:16

ECA577

DirecTV-15SKY Mexico 1

9,960kg

GTO

DirecTVSky México

80

VA-224

15 July 201521:42

ECA578

Star One C4MSG-4

8,587kg

GTO

Star OneEUMETSAT

81

VA-225

20 August 201520:34

ECA579

Eutelsat 8 West BIntelsat 34

9,922kg

GTO

EutelsatIntelsat

82

VA-226

30 September 201520:30

ECA580

NBN Co 1AARSAT-2

10,203kg

GTO

National Broadband NetworkARSAT

83

VA-227

10 November 201521:34

ECA581

Arabsat 6BGSAT-15

9,810kg

GTO

ArabsatISRO

84

VA-228

27 January 201623:20

ECA583

Intelsat 29e

6,700kg

GTO

Intelsat

85

VA-229

9 March 201605:20

ECA582

Eutelsat 65 West A

6,707kg

GTO

Eutelsat

86

VA-230

18 June 201621:38

ECA584

EchoStar 18BRISat

10,730kg

GTO

EchoStarBank Rakyat Indonesia

This mission carried the first satellite owned by a financial institution.

87

VA-232

24 August 201622:16

ECA586

Intelsat 33eIntelsat 36

10,735kg

GTO

Intelsat

Intelsat 33e's LEROS apogee engine, which supposed to perform orbit raising, failed soon after its successful launch, forcing to use the experimentation of low-thrust reaction control system which extended the commissioning time 3 months longer than expected. Later, it suffered other thruster problems which cut its operational lifetime by about 3.5 years. On 19 October 2024 Intelsat 33e disintegrated in orbit and was declared a total loss by Intelsat.

88

VA-231

5 October 201620:30

ECA585

NBN Co 1BGSAT-18

10,663kg

GTO

National Broadband NetworkINSAT

89

VA-233

17 November 201613:06

ES594

Galileo FOC-M6(satellites FM-7, 12, 13, 14)

3,290kg

MEO

ESA

Part of the Galileo satellite navigation system. First Galileo launch on Ariane 5 and from a launch vehicle besides Soyuz.

90

VA-234

21 December 201620:30

ECA587

Star One D1JCSAT-15

10,722kg

GTO

Star OneSKY Perfect JSAT

91

VA-235

14 February 201721:39

ECA588

Intelsat 32e / SkyBrasil-1Telkom-3S

10,485kg

GTO

Intelsat, DirecTV Latin AmericaTelkom Indonesia

This mission carried the first Intelsat EpicNG high-throughput satellite based on the Eurostar E3000 platform, while other Intelsat EpicNG satellites were based on BSS-702MP platform.

92

VA-236

4 May 201721:50

ECA589

Koreasat 7SGDC-1

10,289kg

GTO

KT CorporationSGDC

The launch was delayed from March 2017 due to transportation to the launch site being restricted by a blockade erected by striking workers.

93

VA-237

1 June 201723:45

ECA590

ViaSat-2Eutelsat 172B

10,865kg

GTO

ViaSatEutelsat

Heaviest and most expensive commercial payload ever put into orbit, valued at approximately €675 million (~€844 million including the launch vehicle), until 12 June 2019, when Falcon 9 delivered RADARSAT Constellation with three Canadian satellites, valued almost €844 million (not including the launch vehicle), into orbit. ViaSat-2 suffered antenna glitch, which cut about 15% of its intended throughput.

94

VA-238

28 June 201721:15

ECA591

EuropaSat / Hellas Sat 3GSAT-17

10,177kg

GTO

Inmarsat / Hellas SatISRO

95

VA-239

29 September 201721:56

ECA5100

Intelsat 37eBSAT-4a

10,838kg

GTO

IntelsatB-SAT

Launch was scrubbed from 5 September 2017 due to electrical fault in one of the solid rocket boosters that caused launch abort in the last seconds before liftoff.

96

VA-240

12 December 201718:36

ES595

Galileo FOC-M7(satellites FM-19, 20, 21, 22)

3,282kg

MEO

ESA

Part of the Galileo satellite navigation system.

97

VA-241

25 January 201822:20

ECA5101

SES-14 with GOLDAl Yah 3

9,123kg

GTO

SES, NASAAlYahsat

Telemetry from the launch vehicle was lost after 9 minutes 30 seconds into the flight, after launch vehicle trajectory went off course due to invalid inertial units' azimuth value. Satellites later found to have separated from the upper stage and entered an incorrect orbit with large inclination deviations. However, they were able to reach the planned orbit with small loss of on board propellant for SES-14 and still expected to meet the designed lifetime, but with significant loss on Al Yah 3 (up to 50% of its intended operational life).

98

VA-242

5 April 201821:34

ECA5102

Superbird-8 / Superbird-B3HYLAS-4

10,260kg

GTO

Japanese MoD, SKY Perfect JSATAvanti Communications

Return-to-flight mission after VA-241 mishap on 25 January 2018.

99

VA-244

25 July 201811:25

ES596

Galileo FOC-M8(satellites FM-23, 24, 25, 26)

3,379kg

MEO

ESA

Final flight of Ariane 5ES. Part of the Galileo satellite navigation system.

100

VA-243

25 September 201822:38

ECA5103

Horizons-3eAzerspace-2 / Intelsat 38

10,827kg

GTO

Intelsat, SKY Perfect JSATAzercosmos

Hundredth Ariane 5 mission. Flight VA-243 was delayed from 25 May 2018 due to issues with GSAT-11, which was eventually replaced by Horizons-3e.

101

VA-245

20 October 201801:45

ECA5105

BepiColombo

4,081kg

Heliocentric

ESAJAXA

Part of the Horizon 2000 Plus program, designed to explore Mercury and study its magnetic field, magnetosphere, and composition. Joint mission between ESA and JAXA. First non-NASA spacecraft to visit the planet.

102

VA-246

4 December 201820:37

ECA5104

10,298kg

GTO

103

VA-247

5 February 201921:01

ECA5106

10,018kg

GTO

104

VA-248

20 June 201921:43

ECA5107

10,594kg

GTO

105

VA-249

6 August 201919:30

ECA+5108

10,594kg

GTO

Maiden flight of Ariane 5 ECA+

106

VA-250

26 November 201921:23

ECA5109

Inmarsat-5 F5 (GX 5)TIBA-1

10,495kg

GTO

InmarsatGovernment of Egypt

Final flight of Ariane 5 ECA

107

VA-251

16 January 202021:05

ECA+5110

Eutelsat Konnect (African Broadband Satellite)GSAT-30

7,888kg

GTO

EutelsatISRO

108

VA-252

18 February 202022:18

ECA+5111

JCSAT-17GEO-KOMPSAT 2B

9,236kg

GTO

SKY Perfect JSATKARI

109

VA-253

15 August 202022:04

ECA+5112

Galaxy 30MEV-2BSAT-4b

10,468kgincluding 765kg of support structures.

GTO

IntelsatNorthrop GrummanB-SAT

110

VA-254

30 July 202121:00

ECA+5113

Eutelsat QuantumStar One D2

10,515kg

GTO

EutelsatStar One

111

VA-255

24 October 202102:10

ECA+5115

SES-17Syracuse 4A

11,210kg

GTO

SESDGA

112

VA-256

25 December 202112:20

ECA+5114

James Webb Space Telescope

Sun–Earth

NASA / ESA / CSA / STScI

Part of the Large Strategic Science Missions, a space telescope aimed to perform visible light astronomy and infrared astronomy. Joint mission between NASA, ESA, and the CSA. Designed to act as a successor to the Hubble Space Telescope and the Spitzer Space Telescope.

113

VA-257

22 June 202221:50

ECA+5116

MEASAT-3dGSAT-24

9,829kg

GTO

MEASATNSIL / Tata Play

114

VA-258

7 September 202221:45

ECA+5117

Eutelsat Konnect VHTS

6,400kg

GTO

Eutelsat

115

VA-259

13 December 202220:30

ECA+5118

Galaxy 35Galaxy 36MTG-I1

10,972kg

GTO

IntelsatEUMETSAT

116

VA-260

14 April 202312:14

ECA+5120

Jupiter Icy Moons Explorer (JUICE)

5,963kg

Heliocentric

ESA

Part of the Cosmic Vision program, designed to explore Jupiter and its moons such as Europa, Ganymede, and Callisto. Complements NASA's Europa Clipper. Slated to be first Non-NASA spacecraft to visit an outer Solar System planet and the first to orbit a moon besides the Moon. Last Ariane 5 flight into heliocentric orbit.

117

VA-261

5 July 202322:00

ECA+5119

Syracuse 4B (Comsat-NG 2) Heinrich Hertz (H2Sat)

7,679.8kg

GTO

DGADLR

Ariane 5's last mission.

See also

Notes

References